翻訳と辞書 |
List of Manchester Metrolink stations : ウィキペディア英語版 | List of Manchester Metrolink stations
Since opening in 1992, the Manchester Metrolink light-rail/tram system has grown to a network of 92 stations. The system opened in April 1992 with 20 stations with routes radiating from Manchester Victoria to Bury and Manchester Piccadilly to Altrincham. Phase 2 extended the network to Eccles with 12 new stations and a new interchange at Cornbrook was built in 1999. Phase 3a involved the construction of 36 new stops and new lines to Rochdale via Oldham, Tameside and East Didsbury. The first stops as part of Phase 3a opened in 2011 and the final stop opened in 2014. A new line to Manchester Airport became operational in November 2014 – 12 months ahead of schedule.〔(【引用サイトリンク】title=Airport line )〕 〔(【引用サイトリンク】title=Manchester Metrolink line opens more than a year ahead of schedule )〕 The network consists of over of track, making it the largest tram system in the United Kingdom and second only to the London Underground in terms of an urban commuter network. By the end of 2015 once expansion is complete, the Metrolink system will have 93 stops with the addition of Exchange Square Metrolink station in Manchester city centre. Primary future proposals include a new line to Trafford Park. If this is built, the Metrolink network would be over in length and have over 100 stops. Other proposals include tram-trains to Bolton and Wigan and an extension from East Didsbury to Stockport. ==List of Metrolink stops==
抄文引用元・出典: フリー百科事典『 ウィキペディア(Wikipedia)』 ■ウィキペディアで「List of Manchester Metrolink stations」の詳細全文を読む
スポンサード リンク
翻訳と辞書 : 翻訳のためのインターネットリソース |
Copyright(C) kotoba.ne.jp 1997-2016. All Rights Reserved.
|
|